- Drill through.
- Route-out the core.
- Fill with epoxy.
- Wait.
- Redrill.
- Add a backing plate. Yup, perhaps that should have been FRP and epoxied on before you drilled.
- Through bolt with washer and sealant.
Front of the mount
Back of the mount
- Mount the object to pre-laminated FRP about 1/4-inch thick. In this case I tapped-in threads, mounted the hooks with machine screws, and ground off the excess. T-nuts could be used for heavy duty mounts, or simply thicker glass; at 3/8-inch the threads are typically stronger than the bolts.
- Screw (very short screws only used to apply clamping pressure) and glue (3M 4200 if it's not too heavy and you might remove it, thickened epoxy if it is and you won't remove it).
Finished mount. This holds heavy mooring lines and spare rode, perhaps 20-30 pounds on each section. The coils hang well below the hooks, cow-hitched with slings. The hull is ~ 5/8-inch thick with 3/32-inch triaxial glass skins. Screws alone might hold... for awhile... assuming I don't step on the coil while wading through sails and fenders, which I will.
The hooks are 1/8" x 3/4" aluminum flat bar bent around a double mandrel and ground smooth. I also store my chute in this locker, so I wanted a hook that would hold line but not snag sailcloth. When you can't find what you want, you make it.
I cheat. I get pre-laminated FRP as cast-offs from chemical plant projects. Free is nice. But I've gotten it other places--old signs, cut from old boats. The flat bar were electrician cast-offs. Scrounging 101.